Directly benefiting about 4 lakh people through command area of 25000 hectares
Directly benefiting about 4 lakh people through command area of 25000 hectares
Works performed:
1. River Bank Conservation Work (9.350 km)
2. River Bank Conservation Work Implemented Adjacent to Darbar Sharif (0.850 km)
3. End Termination (0.1040km)
4. River dredging (11.80 km)
5. Construction of ditches (05)
6. Bridge Construction (01)
Planning and Implementation: Cabinet Division, A2I, BCC, DoICT and BASIS